Skip to main content

Projects

Our work balances form, schedule, sustainability, constructability and budget.

projects_5

Pittsburgh International Airport Terminal Modernization in Pennsylvania.

Courtesy Gensler and Allegheny County Airport Authority

arecibo-radio-telescope

Arecibo Radio Telescope

Thornton Tomasetti

projects_header

Protecting the Gina Krog Offshore Production Platform

Thornton Tomasetti

Explore Projects

Go

Featured Projects

30hy_list
30 Hudson Yards

How to build a 101-story, 2.6-million-square-foot office tower, the tallest at Hudson Yards, atop an operational rail yard.

Battersea
Battersea Power Station

‘Phase 3,’ a key part of the regeneration of the Battersea Power station site in London, is one of the most exciting and innovative mixed-use neighbourhoods in the world.

A typical carbon capture cluster, showing how captured CO2 can be transported by pipeline to an offshore injection platform and securely stored one to two kilometers below the seabed.
Carbon Capture & Storage

Reducing CO2 emissions is a global challenge. Carbon capture can help make the world safer today, tomorrow and beyond.

Climate Pledge Arena
Climate Pledge Arena

From world’s fair pavilion to world-class arena – we provided structural and construction engineering to transform a historic venue into a first-class sports and event facility.

hobhouse-list (c) Hufton+Crow
Hobhouse

Protecting history, redeveloping on a delicate footprint and setting a new sustainability benchmark. All at once.

living_heart_model_list
Living Heart Project (VHM)

By advancing testing methods, diagnoses and treatments, our digital models of the human heart can help transform healthcare – and improve patients’ lives.

navy pier Marco Verch/Flickr
Navy Pier

Rebuilding Chicago’s #1 tourist destination wasn’t easy. We pulled back layers of history, went under and over the water, and wove in reinforcements.

vanderbilt_list Courtesy SL Green
One Vanderbilt

How do you construct a supertall building next to one of the world’s busiest transit hubs, and on an accelerated schedule? Start early, and carefully model the entire structure.

hurricanes_list
Post-Hurricane Claims Investigations

Stronger hurricanes are devastating coastal communities. In the aftermath, we act fast and get it done right to help rebuild. For the future, we are working to better protect them.

St. Nicholas Shrine
Saint Nicholas National Shrine

The new Saint Nicholas National Shrine at the World Trade Center replaces a church destroyed in the September 11 terrorist attacks.

metamaterials_list
Seismic Hazard Mitigation Research

New technologies to protect buildings and critical infrastructure from seismic hazard may come from a surprising place: advances in metamaterial science, proven in the defense sector.

Sherman Minton Bridge
Sherman Minton Bridge

What if we could have investigated Minnesota’s I-35 Bridge three months before it collapsed? With the Sherman Minton Bridge, we had that chance.

100 Flatbush Thornton Tomasetti
The Alloy Block

Set to include New York City's first all-electric residential tower, the development fosters a connection to place while planning for future decarbonization.

The Shed
The Shed

How do we make an avant-garde arts center so flexible, it’s future-proof? Make it move, of course!

via57 Thornton Tomasetti
VIA 57 West

Unique buildings need equally unique structures. Our custom solutions deliver them cost-effectively, with built-in efficiency and resilience.

wilshire_grand
Wilshire Grand Center

The tallest building in the Western United States, the 1,100-foot Wilshire Grand redefines the Los Angeles skyline.

Wisconsin Steel Fabrication Plant
Wisconsin Steel Fabrication Plant

Our Advanced Project DeliveryTM method and detailed Tekla models allowed for the plant to be designed, built and turned over in just 12 months.

All Projects

Capital One Center
Capital One Center

The 26-acre site includes offices, a hotel, a performing arts center, public green spaces, sculpture parks, a grocery store, bars and restaurants.