You must have JavaScript enabled to view the full contents of this site.

No Image
January 17, 2014
The ASCE magazine published an article that describes the motivation and the challenges behind the design and construction of the 65,000-seat soccer stadium in Basra Sports City, Iraq, designed by 360 Architecture.
Read more

No Image
January 06, 2014
We may not quite be at 2.0 status just yet, but members of the CORE Studio team have been hard at work with the concept of remote solving
Read more

No Image
January 03, 2014
When we first created it, TTX started out as our structural BIM interoperability platform. Its purpose was to bi-directionally exchange model information between our most commonly used structural analysis and modeling packages. Since we started using a database back-end, we could also keep track of each project revisions.
Read more

No Image
January 03, 2014
Thornton Tomasetti’s Building Sustainability practice, in conjunction with the CORE Studio team, is developing a Rhino/Grasshopper-based, concept-level sustainability analysis platform known as PANDA (Parametric Analysis of eNergy and Daylight Autonomy). 
Read more

No Image
San Francisco has a well-earned reputation for being hip, high energy and environmentally responsible. The same could be said for Thornton Tomasetti’s new space at 650 California St. there, with its open floor plan, modern décor and high-tech touches. If all goes according to plan, it will be our first LEED Platinum office under the U.S. Green Building Council’s new LEED v4 standards.
Read more